Past paper of FPSC
Post name= Assistant Executive Engineer (Civil)
Department: Ministry of Railway
No. of posts: Total posts=15, Punjab= 5
Post case number = F4/214/2019
Test held on = 08/01/2020
Compiled by: Engr. Usman Iftikhar
Note:
Calculator was allowed in this test.
Errors and omissions are accepted.
First 20 questions were from English sentence structuring etc.
- The Westergaard analysis is used for: a) sandy soils b) cohesive soils c) stratified soils d) clayey soil
- Value of B=(6+10/2+5^2)/2 =? 18
- Ground freezing is a) construction dewatering technique b) permanent dewatering technique c) electrical osmosis
- Synonym of neutral is? unbiased
- Synonym of amucus curiare?
- Cause of action means? a factor set of facts that is sufficient to justify legal action
- Synonym of embezzle is? misappropriate
- Synonym of dilemma is? difficult situation
- Contingency is? conditional, dependent, both
- Synonym of paradigm? is pattern
- Horizontal and vertical angles in survey are not measured by? a) theodolite b) total station c) sight level d) none
- Test not preferred for freshly mixed concrete is?segregation, compaction factor, slump, ductility
- Slump value for good structural concrete is? 90-120 mm
- Back sight is the first reading in theodolite survey.
- When instrument is shifted, it is called? change point
- In survey, station is a?
- Traverse survey is preferred in establishing? control network
- Two peg test is used for? checking or recalibrating the level or transit
- Optimum moisture content is obtained from? standard proctor test
- Clay is an example of? aquifer, aquitard, aquiclude, none
- Sheet foot roller is used for? cohesive soils
- Asphalt rolling thin film test is used for? This test is used to measure the combined effects of heat and air on a thin film of bitumen or bituminous binder in permanent renewal.
- Flownet comprises of? flow lines and equipotential lines
- Hydraulic gradient of sandy soil is equal to 1, then flow condition shows? quick sand
- Perched water table occurs in? consolidated region, saturated region, vadose zone etc
- Deviator stress is? sigma1-sigma3
- In unconfined compressive strength test? sigma3=0
- Void ratio vs log stress graph slope gives? coefficient of consolidation, Cv, Cc
- From activity chart diagram, answer the questions, (30-34)
- Critical path
- Free float
- Earliest start time
- Activity name on arrow network diagram
- Activity name on node network diagram
- Calculate effective stress from the slope diagram. 2 questions
- Find effective stress at point A. Soil unit weight above the water table is 123 pcf and below the water table is 120 pcf. Point is located 20 feet below water table. Height of soil above water table is 14’
- Yielding occurs on ultimate load in? under/over reinforced beams
- Tensile strength of concrete is measured by? modulus of rupture
- Method by which we can find air content of freshly mixed concrete is by? pressure and volumetric method
- Which one is not method of concrete mix design?
- When distance between 2 stations is equal it is called? balancing station
- Normal consistency of cement is measured by? Vicat apparatus
- Convert square foot to acres and then find per acre price.
- Finding road front side by using Pythagoras theorem
- Finding height of pole by using Pythagoras theorem
- By using (a+b/2)bh find area
- Few questions from stress strain graph of mild steel e.g. % elongation, ductility, modulus of elasticity,
- Find value of fineness modulus of coarse-grained soil from table
- Algorithm, program, software, which of these consists of series of calculations and then problem is solved.
- Find D10, Cu, Cc from values of D10, D30, D60
- Cold mixed asphalt is used for heavy traffic, low traffic
- P=I2R formula
- Mortar is mixture of? cement, sand, water
- SPT values for counting number of blows is for depth? of last 12” penetration
- Triaxial test is used for computation of? shear parameters
- Factor to be considered for bending of sheets is its? ductility
- If a labour takes 50 $ per hour for excavation and 2 labors are hired and they will work for 8 hrs per day. How many days will they take for salary of 4000$ = 5 days
- Few questions from excel sheets
- Beam was given and shear force, bending moment was to be calculated.
- T beam was given and numerical was to be solved.
- Under reinforced beam was given and numerical was to be solved.
Very handy material