{"id":626,"date":"2020-02-09T09:29:37","date_gmt":"2020-02-09T09:29:37","guid":{"rendered":"https:\/\/seismicconsolidation.com\/?p=626"},"modified":"2020-02-09T09:41:38","modified_gmt":"2020-02-09T09:41:38","slug":"irrigation-engineering-lab","status":"publish","type":"post","link":"https:\/\/seismicconsolidation.com\/irrigation-engineering-lab\/","title":{"rendered":"Irrigation Engineering lab"},"content":{"rendered":"

Job 1: Indus Basin Irrigation System<\/strong><\/p>\n

    \n
  1. Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)1<\/a><\/li>\n
  2. Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)2<\/a><\/li>\n
  3. Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)3<\/a><\/li>\n<\/ol>\n

    Job 2: Design of irrigation system<\/strong><\/p>\n

    Instructions:<\/em><\/p>\n

      \n
    1. lab 2.Design of Irrigation System<\/a><\/li>\n
    2. lab 3,4,5.Design of Irrigation System (Part 2)<\/a><\/li>\n
    3. Research Report – Design and Practice of Water Allocation Rules – Lessons from Warabandi in Pakistans Punjab – International Irrigation Management Institute – 1998<\/a><\/li>\n
    4. Warabandi in Pakistan’s irrigation canal system<\/a><\/li>\n<\/ol>\n

      Design reports<\/em><\/p>\n

        \n
      1. Canal design report<\/a><\/li>\n
      2. Canal design Excel sheet<\/a><\/li>\n
      3. Design of canal by Kennedy regime theory excel sheet<\/a><\/li>\n<\/ol>\n

        Job 3: Design of barrage<\/strong><\/p>\n

          \n
        1. Barrage design excel sheet<\/a><\/li>\n
        2. Cross section of barrage<\/a><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"

          Job 1: Indus Basin Irrigation System Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)1 Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)2 Indus Basin Irrigation System and it various Salient Features (Barrages, Headwork, Canals and Dams)3 Job 2: Design of irrigation system Instructions:…<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[87],"tags":[106,105,104],"_links":{"self":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/626"}],"collection":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/comments?post=626"}],"version-history":[{"count":2,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/626\/revisions"}],"predecessor-version":[{"id":647,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/626\/revisions\/647"}],"wp:attachment":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/media?parent=626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/categories?post=626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/tags?post=626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}