{"id":2563,"date":"2020-04-19T07:47:14","date_gmt":"2020-04-19T07:47:14","guid":{"rendered":"https:\/\/seismicconsolidation.com\/?p=2563"},"modified":"2020-04-19T09:22:17","modified_gmt":"2020-04-19T09:22:17","slug":"hydropower-engineering-notes","status":"publish","type":"post","link":"https:\/\/seismicconsolidation.com\/hydropower-engineering-notes\/","title":{"rendered":"Hydropower engineering notes"},"content":{"rendered":"
Hydropower Engineering<\/span><\/strong><\/p>\n Hydropower engineering (Principles of hydropower engineering)<\/a><\/p>\n Hydropower engineering (Hydropower water conveyance system)<\/a><\/p>\n Hydropower engineering (Hydropower equipment and general station)<\/a><\/p>\n Hydropower enginneering general notes<\/a><\/p>\n Instruction manual for water turbine<\/a><\/p>\n Hydel Power Potential in Pakistan<\/a><\/p>\n Hydro power resources of Pakistan<\/a><\/p>\n Hydropower Engineering (Lecture slides)<\/a><\/p>\n High head hydropower development notes<\/strong><\/span><\/p>\n Data collection:<\/strong><\/p>\n 1. High head hydropower Data Collection and data processing (Load demand analysis and forecast)<\/a><\/p>\n 2. High head hydropower Data Collection and data processing (Topography)<\/a><\/p>\n 3. High head hydropower Data Collection and data processing (Hydrology)<\/a><\/p>\n 4. High head hydropower Data Collection and data processing (Sediment)<\/a><\/p>\n 6. High head hydropower Data Collection and data processing (Seismicity)<\/a><\/p>\n 7. High head hydropower Data Collection and data processing (Environmental and socioeconomical aspects)<\/a><\/p>\n Financial Analysis:<\/strong><\/p>\n 1. High head hydropower economic and financial analysis (quantity survey and const estimation)<\/a><\/p>\n 2. High head hydropower economic and financial analysis (project phasing and construction schedule)<\/a><\/p>\n 3. High head hydropower economic and financial analysis (economic and financial analysis)<\/a><\/p>\n 4. High head hydropower economic and financial analysis (long term system expansion planning)<\/a><\/p>\n 5. High head hydropower economic and financial analysis (hydrothermal operation)<\/a><\/p>\n 6. High head hydropower economic and financial analysis (determination of SRMC & LRMC)<\/a><\/p>\n Layout and sizing:<\/strong><\/p>\n 1. Layout and sizing (General)<\/a><\/p>\n 2. Layout and sizing (Sizing of structures)<\/a><\/p>\n 5. Layout and sizing (Hydraulic modelling in hydropower development)<\/a><\/p>\n Components:<\/strong><\/p>\n High head hydro power components<\/a><\/p>\n Low head hydropower development notes<\/strong><\/span><\/p>\n Data collection:<\/strong><\/p>\n 1. Data Collection (Power market survey)<\/a><\/p>\n 2. Data Collection (Topography)<\/a><\/p>\n 3. Data Collection (Hydrology)<\/a><\/p>\n 4. Data Collection (Sediment)<\/a><\/p>\n 6. Data Collection (Seismicity)<\/a><\/p>\n 7. Data Collection (Environment and socioeconomical aspects)<\/a><\/p>\n Engineering design:<\/strong><\/p>\n 1. Civil engineering design<\/a><\/p>\n