{"id":2563,"date":"2020-04-19T07:47:14","date_gmt":"2020-04-19T07:47:14","guid":{"rendered":"https:\/\/seismicconsolidation.com\/?p=2563"},"modified":"2020-04-19T09:22:17","modified_gmt":"2020-04-19T09:22:17","slug":"hydropower-engineering-notes","status":"publish","type":"post","link":"https:\/\/seismicconsolidation.com\/hydropower-engineering-notes\/","title":{"rendered":"Hydropower engineering notes"},"content":{"rendered":"

Hydropower Engineering<\/span><\/strong><\/p>\n

Hydropower engineering (Principles of hydropower engineering)<\/a><\/p>\n

Hydropower engineering (Hydropower water conveyance system)<\/a><\/p>\n

Hydropower engineering (Hydropower equipment and general station)<\/a><\/p>\n

Hydropower enginneering general notes<\/a><\/p>\n

Instruction manual for water turbine<\/a><\/p>\n

Hydel Power Potential in Pakistan<\/a><\/p>\n

Hydro power resources of Pakistan<\/a><\/p>\n

Hydropower Engineering (Lecture slides)<\/a><\/p>\n

High head hydropower development notes<\/strong><\/span><\/p>\n

Data collection:<\/strong><\/p>\n

1. High head hydropower Data Collection and data processing (Load demand analysis and forecast)<\/a><\/p>\n

2. High head hydropower Data Collection and data processing (Topography)<\/a><\/p>\n

3. High head hydropower Data Collection and data processing (Hydrology)<\/a><\/p>\n

4. High head hydropower Data Collection and data processing (Sediment)<\/a><\/p>\n

6. High head hydropower Data Collection and data processing (Seismicity)<\/a><\/p>\n

7. High head hydropower Data Collection and data processing (Environmental and socioeconomical aspects)<\/a><\/p>\n

Financial Analysis:<\/strong><\/p>\n

1. High head hydropower economic and financial analysis (quantity survey and const estimation)<\/a><\/p>\n

2. High head hydropower economic and financial analysis (project phasing and construction schedule)<\/a><\/p>\n

3. High head hydropower economic and financial analysis (economic and financial analysis)<\/a><\/p>\n

4. High head hydropower economic and financial analysis (long term system expansion planning)<\/a><\/p>\n

5. High head hydropower economic and financial analysis (hydrothermal operation)<\/a><\/p>\n

6. High head hydropower economic and financial analysis (determination of SRMC & LRMC)<\/a><\/p>\n

Layout and sizing:<\/strong><\/p>\n

1. Layout and sizing (General)<\/a><\/p>\n

2. Layout and sizing (Sizing of structures)<\/a><\/p>\n

5. Layout and sizing (Hydraulic modelling in hydropower development)<\/a><\/p>\n

Components:<\/strong><\/p>\n

High head hydro power components<\/a><\/p>\n

Low head hydropower development notes<\/strong><\/span><\/p>\n

Data collection:<\/strong><\/p>\n

1. Data Collection (Power market survey)<\/a><\/p>\n

2. Data Collection (Topography)<\/a><\/p>\n

3. Data Collection (Hydrology)<\/a><\/p>\n

4. Data Collection (Sediment)<\/a><\/p>\n

6. Data Collection (Seismicity)<\/a><\/p>\n

7. Data Collection (Environment and socioeconomical aspects)<\/a><\/p>\n

Engineering design:<\/strong><\/p>\n

1. Civil engineering design<\/a><\/p>\n

3. Electrical engineering design<\/a><\/p>\n

Financial analysis:<\/strong><\/p>\n

Financial Analysis (Quantity survey and cost estimation)<\/a><\/p>\n

 <\/p>\n","protected":false},"excerpt":{"rendered":"

Hydropower Engineering Hydropower engineering (Principles of hydropower engineering) Hydropower engineering (Hydropower water conveyance system) Hydropower engineering (Hydropower equipment and general station) Hydropower enginneering general notes Instruction manual for water turbine Hydel Power Potential in Pakistan Hydro power resources of Pakistan Hydropower Engineering (Lecture slides) High head hydropower development notes Data collection: 1. High head hydropower…<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[299],"tags":[],"_links":{"self":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/2563"}],"collection":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/comments?post=2563"}],"version-history":[{"count":3,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/2563\/revisions"}],"predecessor-version":[{"id":2595,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/posts\/2563\/revisions\/2595"}],"wp:attachment":[{"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/media?parent=2563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/categories?post=2563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/seismicconsolidation.com\/wp-json\/wp\/v2\/tags?post=2563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}